Today I added:
- The four posts to the top of the table
- The roof of the table
- The two burners that will heat up the plastic
- The four rails
- Half of the frame built
- Kim bought my roto zip bits
To finish up I'll need to:
- Finish the frame
- Cut the hole in the bottom/inside of the table
- Add the plastic tube and connect it to the leaf blower
Once this is done (hopefully by/on Sunday) I'll be starting the driod proper. To do this, I'll need:
- Some 3/4 inch plywood
- Some 1/2 inch plywood
- Make some templates
- Start a cuttin'!
I'm starting to get excited with the project...having worked on this vacuum table has been a nice starter...I've found another such project that I'll probably work on during the droid build. It's a CNC machine that I can build myself. I've put a link to it on the sidebar in case you'd like to take a look at it. I can see several uses for it in a lot of different things, particularly in the droid build.